Publications

Title Author Year Publication type
Application of Fuzzy Logic and Neural Networks to Automatically Detect Freeway Traffic Incidents Hsiao, Chien-Hua; Lin, Ching-Teng; Cassidy, Michael 1994 Journal Article
Simulation Modeling Of The Santa Monica Freeway Bloomberg, Loren D.; May, Adolf D. 1994 Research Report
The Cell Transmission Model: Network Traffic Daganzo, Carlos 1994 Research Report
Improving Transit Performance With Advanced Public Transportation System Technologies Hansen, Mark; Qureshi, Mohammad; Rydzewski, Daniel 1994 Research Report
Fault Detection And Tolerant Control For Lateral Guidance Of Vehicles In Automated Highways Patwardhan, Satyajit Neelkanth 1994 Research Report
The Cell Transmission Model: A Dynamic Representation of Highway Traffic Consistent with the Hydrodynamic Theory Daganzo, Carlos F. 1994 Journal Article
Modeling IVHSEmission Impacts Volume II: Assessement Of The Caline 4 Line Source Dispersion Model Washington, Simon; Guensler, Randall; Sperling, Daniel 1994 Research Report
An Assessment Of Ivhs-apts Technology Impacts On Energy Consumption And Vehicle Emissions Of Transit Bus Fleets Jolibois, Jr., Sylvan C.; Kanafani, Adib 1994 Research Report
A Functional Architecture For Automated Highway Traffic Planning Tsao, H. S. Jacob 1994 Research Report
Ultrasonic Ranging Control Board Documentation Chen, Jennie; Foreman, Bret; Mostov, Kirill 1994 Research Report
An Investigation Of The Costs Of Roadway Traffic Congestion: A Preparatory Step For IVHSBenefit's Evaluation Miller, Mark A.; Li, Kayin 1994 Research Report
The Role of Teamwork in a Planning Methodology for Intelligent Transportation Systems: Volume 1 Kanafani, Adib; Manheim, Marvin L.; Khattak, Asad; Vlahos, Nicholas J. 1994 Research Report
Stated And Reported Route Diversion Behavior: Implications On The Benefits Of ATIS Khattak, Asad; Kanafani, Adib; Le Colletter, Emmanuel 1994 Research Report
Stated And Reported Diversion To Public Transportation In Response To Congestion: Implications On The Benefits Of Multimodal ATIS Khattak, Asad; Le Colletter, Emmanuel 1994 Research Report
Modeling of the Brake Line Pressure to Tire Brake Force Subsystem Xu, Z.; Ioannou, P. 1994 Research Report
Issues In Fault Tolerant Control Of Vehicle Follower Systems Hedrick, J. K.; Garg, V. 1994 Research Report
A Time Headway Autonomous Intelligent Cruise Controller: Design and Simulation Ioannou, P.A.; Ahmed-Zaid, F.; Wuh, D.H. 1994 Research Report
An Interface Between Continuous And Discrete-event Controllers For Vehicle Automation Lygeros, John; Godbole, Datta N. 1994 Research Report
Adaptive Throttle Control For Speed Tracking Xu, Z.; Ioannou, P. 1994 Research Report
Throttle And Brake Control Systems For Automatic Vehicle Following Ioannou, P.; Xu, Z. 1994 Research Report
Advances in Fuzzy Logic Control for Lateral Vehicle Guidance Hessburg, Thomas; Tomizuka, Masayoshi 1994 Research Report
Roadway Powered Electric Vehicle Project Track Construction And Testing Program Phase 3D Systems Control Technology, Inc. 1994 Research Report
TravInfo Evaluation Plan: Update 1 Yim, Youngbin; Khattak, Asad; Miller, Mark; Hall, Randolph; Weissenberger, Stein 1994 Research Report
A Conceptual Approach for Developing and Analyzing Alternate Evolutionary Deployment Strategies for Intelligent Vehicle/Highway Systems Al-Ayat, Rokaya; Hall, Randolph 1994 Research Report
A Combined Traveler Behavior And System Performance Model With ATIS Khattak, Asad; Al-deek, Haitham; Thananjeyan, Paramsothy 1994 Research Report
Vehicle Traction Control And its Applications Kachroo, Pushkin; Tomizuka, Masayoshi 1994 Research Report
Platoon Collision Dynamics And Emergency Maneuvering II: Platoon Simulations For Small Disturbances Tongue, Benson H.; Yang, Yean-tzong 1994 Research Report
Capacity Of Automated Highway Systems: Effect Of Platooning And Barriers Tsao, H. S. Jacob; Hall, Randolf; Hongola, Bruce 1994 Research Report
Platoon Collison Dynamics And Emergency Maneuvering III: Platoon Collison Models And Simulations Tongue, Benson H.; Yang, Yean-tzong 1994 Research Report
Drag Measurements On A Platoon Of Vehicles Zabat, Michael; Farascaroli, Stefano; Browand, Frederick; Nestlerode, Michael; Baez, John 1994 Research Report
Smart Corridor Evaluation Plan: Conceptual Design Miller, Mark; Khattak, Asad; Hall, Randolph; Giuliano, Genevieve; Moore, James; Wachs, Martin 1994 Research Report
Experimental Results Of Fuzzy Logic Control For Lateral Vehicle Guidance Hessburg, Thomas; Peng, Hei; Zhang, Wei-bin; Arai, Alan; Tomizuka, Masayoshi 1994 Research Report
Incidents And Intervention On Freeways Heydecker, Bejamin 1994 Research Report
Evaluation of the Fuel-Efficient Traffic Signal Management (FETSIM) Program: 1983-1993 Skabardonis, Alexander 1994 Research Report
AHS Deployment: A Preliminary Assessment of Uncertainties Hall, Randolph W.; Tsao, H.-S. Jacob 1994 Research Report
Technical Description of NETCELL: General Framework and Data Structure Lin, Wei-Hua; Daganzo, Carlos F. 1994 Research Report
Effect of Modeling Assumptions on Evolution of Queues in a Single Corridor Daganzo, Carlos F.; Lin, Wei-Hua 1994 Journal Article
Robust Multiple Car Tracking With Occlusion Reasoning Koler, Dieter; Weber, Joseph; Malik, Jitendra 1994 Research Report
Assessing The Safety Benefits Of Automated Freeways Anwar, Mohammed; Jovanis, Paul P. 1993 Research Report
Development Of User Needs And Functional Requirements For A Real-time Ridesharing System Kowshik, Raghu; Gard, John; Loo, Jason; Jovanis, Paul P.; Kitamura, Ryiuichi 1993 Research Report
California Transportation Management Centers Part 1. Assessment Of Existing Capabilities Lo, Hong K.; Hall, Randolph W.; Windover, John R. 1993 Research Report
Highway Electrification And Automation Technologies - Regional Impacts Analysis Project: Phase III Appendices: Mobility Statistics Scag; Path 1993 Research Report
Highway Electrification And Automation Technologies - Regional Impacts Analysis Project: Phase II: Scenario For Advanced Highway Technologies Scag; Partners for Advanced Transportation Technology (PATH) 1993 Research Report
Highway Electrification And Automation Technologies - Regional Impacts Analysis Project: Executive Summary Scag; Path 1993 Research Report
Highway Electrification And Automation Technologies - Regional Impacts Analysis Project: Phase III: Impacts Analysis Results Scag; Path 1993 Research Report
Communication Requirements and Network Design for IVHS Hsu, Ivy Pei-Shan; Walrand, Jean 1993 Research Report
A Simulation-Based Framework For The Analysis Of Traffic Networks Operating With Real-time Information Jayakrishnan, R.; Cohen, Michael; Kim, John; Mahmassani, Hani S.; Hu, Ta-yin 1993 Research Report
Models Of Commuters' Information Use And Route Choice: Initial Results Based On A Southern California Commuter Route Choice Survey Abdel-aty, Mohamed A.; Vaughn, Kenneth M.; Kitamura, Ryuichi; Jovanis, Paul P.; Mannering, Fred L. 1993 Research Report
Travinfo Evaluation Plan Yim, Youngbin; Khattak, Asad; Miller, Mark; Hall, Randolf 1993 Research Report
Decision Support And Consensus Building For PLANiTS Kanafani, Adib; Crotty, Melanie 1993 Research Report