Constraints On Initial Ahs Deployment And The Concept Definition Of A Shuttle Service For Ahs Debut |
Tsao, H. S. Jacob |
1996 |
Research Report |
Stage Definition For Ahs Deployment And An Ahs Evolutionary Scenario |
Tsao, H. S. Jacob |
1996 |
Research Report |
Transportation Modeling For The Environment: Final Report |
Barth, Matthew; Norbeck, Joseph |
1996 |
Research Report |
Formal Specification And Verification Of The Entry And Exit Maneuvers |
Sachs, S. R.; Varaiya, P. |
1996 |
Research Report |
Integrated Maneuvering Control Design And Experiments: Phase II |
Hedrick, J. K.; Pantarotto, M.; Yoshioka, T.; Chen, Y.; Connolly, T.; Narendran, V. K. |
1996 |
Research Report |
Application of Ordered Probit Techniques to Analyze Ratings of Blissymbol Complexity |
Soto, Gloria; Cassidy, Michael; Madanat, Samer |
1996 |
Journal Article |
Decision-Making System for Freeway Incident Response Using Sequential Hypothesis Testing Methods |
Madanat, Samer M.; Cassidy, Michael J.; Teng, Hua-Liang; Liu, Pen-Chi |
1996 |
Journal Article |
Longitudinal Control Development For IVHS Fully Automated And Semi-automated Systems: Phase II |
Hedrick, J. K.; Garg, V.; Gerdes, J. C.; Maciuca, D. B.; Swaroop, D. |
1996 |
Research Report |
Unique Bivariate Relationships in Highway Traffic |
Cassidy, Michael J. |
1996 |
Journal Article |
Effects of Queue Spillovers in Transportation Networks with a Route Choice |
Daganzo, Carlos F. |
1996 |
Book |
Dymanic Traffic Assignment With Queues For ATIS : Final Report For Project MOU 90 |
Daganzo, Carlos F. |
1996 |
Research Report |
Public Transit Use By Non-driving Disabled Persons: The Case Of The Blind And Vision Impaired |
Golledge, R.; Costanzo, C. M.; Martson, J. |
1996 |
Research Report |
Fuzzy Throttle And Brake Control For Platoons Of Smart Cars |
Kim, H.; Dickerson, J.; Kosko, B. |
1995 |
Research Report |
Fuzzy Traffic Density Homogenizer For Automated Highway Systems |
Chien, C. C.; Ioannou, P.; Chu, C.K. |
1995 |
Research Report |
A Theory Of Traffic Flow In Automated Highway Systems |
Broucke, M.; Varaiya, P. |
1995 |
Research Report |
A Dynamic Visualization Environment For The Design And Evaluation Of Automatic Vehicle Control Systems |
Xu, Z. |
1995 |
Research Report |
Los Angeles Smart Traveler Field Operational Test Evaluation |
Giuliano, G.; Hall, R.; Golob, J. |
1995 |
Research Report |
Theory of Highway Traffic Flow: 1945 to 1965 |
Newell, Gordon F. |
1995 |
Journal Article |
Investigating Intelligent Transportation Systems Strategies On The Santa Monica Freeway Corridor: Technical Appendix |
Bacon, Jr., V.; Windover, J.; May, A. |
1995 |
Research Report |
Organizing For Its: Computer Integrated Transportation Phase 2: Results For Commercial Vehicle Operators |
Hall, Randolf; Chatterjee, Indrajit |
1995 |
Research Report |
Investigating Intelligent Transportation Systems Strategies On The Santa Monica Freeway Corridor: Technical Appendix |
Bacon, Jr., V.; Windover, John; May, Adolf D. |
1995 |
Research Report |
Modeling And Control Design For A Computer Controlled Brake System |
Raza, H.; Xu, Z.; Ioannou, P.; Yang, B. |
1995 |
Research Report |
Intelligent Sensor Validation And Sensor Fusion For Reliability And Safety Enhancement In Vehicle Control |
Agogino, Alice; Goebel, Kai; Alag, Sanam |
1995 |
Research Report |
Socio-economic Attributes And Impacts Of Travel Reliability: A Stated Preference Approach |
Small, K.; Noland, R.; Koskenoja, P. |
1995 |
Research Report |
Travinfo Field Operational Test Traveler Information Center (TIC) Study (technology Evaluation Element) Implementation Plan |
Miller, Mark; Hall, Randolph |
1995 |
Research Report |
Steady State Conditions on Automated Highways |
del Castillo, Jose M.; Lovell, David J.; Daganzo, Carlos F. |
1995 |
Preprint |
Concurrent Air Quality Analysis Under the National Environmental Policy Act and Transportation/Air Quality Conformity |
Shaheen, Susan; Guensler, Randall; Mar, Francisca |
1995 |
Journal Article |
Fuzzy Logic Control For Lane Change Maneuvers In Lateral Vehicle Guidance |
Hessburg, Thomas; Tomizuka, Masayoshi |
1995 |
Research Report |
The Aerodynamic Performance Of Platoons: A Final Report |
Zabat, Michael; Stabile, Nick; Farascaroli, Stefano; Browand, Frederick |
1995 |
Research Report |
The Variance of the Number of Customers in an Infinite-Server Queueing System with an Arbitrarily Correlated Arrival Process |
Daganzo, Carlos F.; Diez-Roux, Esteban |
1995 |
Journal Article |
A Staggered-Diamond Design For Automated/Manual - HOV Highway-to-Highway Interchange |
Tsao, Jacob |
1995 |
Research Report |
Traffic Control For Automated Highway Systems: A Conceptual Framework |
Tsao, Jacob |
1995 |
Research Report |
Turning Movement Estimation In Real Time (TMERT) |
Martin, Peter T. |
1995 |
Research Report |
Adaptive Vehicle Traction Control |
Lee, Hyeongcheol; Tomizuka, Masayoshi |
1995 |
Research Report |
A Machine Vision Based System for Guiding Lane-Change Maneuvers |
Malik, Jitendra; Koller, Dieter; Luong, Tuan |
1995 |
Research Report |
Macroscopic Roadway Traffic Controller Design |
Chien, C. C.; Zhang, Y.; Stotsky, A.; Dharmasena, S. R.; Ioannou, P. |
1995 |
Research Report |
Requiem for Second-Order Fluid Approximations of Traffic Flow |
Daganzo, Carlos F. |
1995 |
Journal Article |
A Finite Difference Approximation of the Kinematic Wave Model of Traffic Flow |
Daganzo, Carlos F. |
1995 |
Journal Article |
Low Speed Collison Dynamics And Control: Year One Report |
Tongue, Benson H.; Moon, Ahrie |
1995 |
Research Report |
Vehicles As Probes |
Sanwal, Kumud K.; Walrand, Jean |
1995 |
Research Report |
Longitudinal Control- Phase 1 |
Chang, Kwang Soo |
1995 |
Research Report |
Longitudinal State Estimation For A Four-vehicle Platoon |
Merz, A. W. |
1995 |
Research Report |
Planits: The Case-Based Reasoner As A Planning Tool For Intelligent Transportation Systems |
Khattak, Asad; Kanafani, Adib |
1995 |
Research Report |
Optimization Tools For Automated Vehicle Systems |
Shiller, Zvi |
1995 |
Research Report |
Dynamic Modeling Of Tractor-semitrailer Vehicles In Automated Highway Systems |
Chen, Chieh; Tomizuka, Masayoshi |
1995 |
Research Report |
Driving Safely In Smart Cars |
Puri, Anuj; Varaiya, Pravin |
1995 |
Research Report |
Lateral Control Of Commuter Buses |
Hingwe, Pushkar; Tomizuka, Masayoshi |
1995 |
Research Report |
An Adaption Method For Fuzzy Logic Controllers In Lateral Vehicle Guidance |
Hessburg, Thomas; Tomizuka, Masayoshi |
1995 |
Research Report |
Freeway Service Patrol (fsp) 1.1: The Analysis Software For The Fsp Project |
Petty, Karl |
1995 |
Research Report |
Configuration And Maneuvers In Safety-consciously Designed Ahs Configuration |
Hitchcock, Anthony |
1995 |
Research Report |