Methods Of Analysis Of IVHS Safety |
Hitchcock, Anthony |
1992 |
Research Report |
Feasibility Study Of Advanced Technology Hov Systems: Volume 2a: Feasibility Of Implementing Roadway Powered Electric Vehicle Technology In El Monte Busway: A Case Study |
Chira-Chavala, Ted; Lechner, Edward H.; Empey, Dan M. |
1992 |
Research Report |
Highway Electrification And Automation |
Shladover, Steven E. |
1992 |
Research Report |
Feasibility Study Of Advanced Technology Hov Systems: Volume 3: Benefit Implications Of Alternative Policies For Including Hov Lanes In Route Guidance Networks |
Chira-Chavala, T.; Lin, W. H. |
1992 |
Research Report |
Transitional Platoon Maneuvers In An Automated Highway System |
Hedrick, J. K.; Narendran, V. K.; Chang, K. S. |
1992 |
Research Report |
Experimental Automatic Lateral Control System For An Automobile |
Peng, Huei; Zhang, Wei-bin; Arai, Alan; Lin, Ye; Hessburg, Thomas; Devlin, Peter; Tomizuka, Masayoshi; Shladover, Steven |
1992 |
Research Report |
Restricting Road Use Can Benefit Everyone, Part II: Time-of-Day Restrictions that Encourage Earlier Arrivals |
Daganzo, Carlos F. |
1992 |
Research Report |
Restricting Road Use Can Benefit Everyone |
Daganzo, Carlos F. |
1992 |
Research Report |
Potential Payoffs From IVHS: A Framework For Analysis Appendix C |
Rockwell International Science Center |
1992 |
Research Report |
Bay Area ATIS Testbed Plan |
Khattak, Asad; Al-Deek, Haitham; Yim, Youngbin; Hall, Randolf |
1992 |
Research Report |
Potential Payoffs From IVHS: A Framework For Analysis |
Rockwell International Science Center |
1992 |
Research Report |
Theoretical And Empirical Analysis Of Path Magnetic Lane Tracking For The Intelligent Vehicle Highway System |
Andrews, Angus; Rockwell International Science Center |
1992 |
Research Report |
Simple Upper Bound Formulae for the VRP Distance |
Daganzo, C. |
1992 |
Research Report |
Analysis of Baggage Sorting Schemes for Containerized Aircraft |
Robusté, Francesc; Daganzo, Carlos F. |
1992 |
Journal Article |
Another Look at the Nested Logit Model |
Daganzo, C.; Kusnic, M. |
1992 |
Research Report |
Expanding Usage Of Cellular Phones: User Profile And Transportation Issues |
Yim, Youngbin; Kanafani, Adib; Ygnace, Jean-luc |
1991 |
Research Report |
A Fuzzy Rule-Based Controller For Automotive Vehicle Guidance |
Hessburg, Thomas; Tomizuka, Masayoshi |
1991 |
Research Report |
Control Strategies And Route Guidance In Signal Controlled Networks |
Skabardonis, Alexander |
1991 |
Research Report |
An Experimental Study On Lateral Control Of A Vehicle |
Hessburg, Thomas; Peng, Huei; Tomizuka, Masayoshi; Zhang, Wei-bin |
1991 |
Research Report |
Optimal Preview Control For Vehicle Lateral Guidance |
Peng, Huei; Tomizuka, Masayoshi |
1991 |
Research Report |
Platoon Collision Dynamics And Emergency Maneuvering I: Reduced Order Modeling Of A Platoon For Dynamical Analysis |
Tongue, Benson H.; Yang, Yean-tzong; White, Matthew T. |
1991 |
Research Report |
Evaluation Of Highway Bottlenecks |
Hall, Randolph W.; Kamoun, Mahdi |
1991 |
Research Report |
BTS (Version 1 .1) - Bottleneck Traffic Simulator User’s Manual |
Lin, Wei Hua; Hall, Randolph W. |
1991 |
Research Report |
Use Of NASS Data For Evaluation Of AVCS Devices |
Hitchcock, Anthony |
1991 |
Research Report |
Fault Tree Analysis Of A First Example Automated Freeway |
Hitchcock, Anthony |
1991 |
Research Report |
A First Example Specification Of An Automated Freeway |
Hitchcock, Anthony |
1991 |
Research Report |
Time Benefits of New Transportation Technologies: The Case of Highway Automation |
Hall, Randolph W. |
1991 |
Research Report |
Incident Management with Advanced Traveller Information Systems |
Al-Deek, Haitham; Kanafani, Adib |
1991 |
Research Report |
Model Selection And Initial Application Of CONTRAM Model For Evaluating In-vehicle Information Systems |
Gardes, Yonnel; Haldors, Bruce; May, Adolf D. |
1991 |
Research Report |
Electronic Toll Collection System (ETC) User Survey |
Yim, Youngbin |
1991 |
Research Report |
Bounding the VRP Distance Before Knowing the Location of Points |
Daganzo, Carlos F. |
1991 |
Research Report |
Notes From a Talk on Standards and IVHS Safety |
Hitchcock, Anthony |
1991 |
Research Report |
Design Of Platoon Maneuver Protocols For IVHS |
Hsu, Ann; Eskafi, Farokh; Sachs, Sonia; Varaiya, Pravin |
1991 |
Research Report |
Restructuring The Automobile/highway System For Lean Vehicles: The Scaled Precedence Activity Network (SPAN) Approach |
Pitstick, Mark E.; Garrison, William L. |
1991 |
Research Report |
Centralized Hub‐Terminal Geometric Concepts. II: Baggage and Extensions |
Robusté, Francesc; Daganzo, Carlos F. |
1991 |
Journal Article |
BTS (version 1.0): Bottleneck Traffic Simulator User's Manual |
Lin, Wei Hua; Hall, Ranolph W. |
1991 |
Research Report |
Sketch Of An Ivhs Systems Architecture |
Varaiya, P. P.; Shladover, Steven E. |
1991 |
Research Report |
Synchronizing Production and Transportation Schedules |
Blumenfeld, Dennis E.; Burns, Lawrence D.; Daganzo, Carlos F. |
1991 |
Journal Article |
An Application of Advanced Technologies for Freeway Traffic Management: An Indiana Case Study |
Cassidy, Michael J.; Sinha, Kumares C. |
1991 |
Conference Paper |
Studies of The Adoption And Use Of Location And Communication Technologies By The Trucking Industry |
Scapinakis, Dimitris A.; Garrison, William Louis |
1991 |
Research Report |
Proposed Analytical Technique for Estimating Capacity and Level of Service of Major Freeway Weaving Sections |
Cassidy, Michael J.; May, Adolf D. |
1991 |
Journal Article |
User Perceived Benefits with Navigation Systems |
Commeignes, Hervé |
1991 |
Research Report |
Communications And Positioning Systems In The Motor Carrier Industry |
Scapinakis, Dimitris A.; Garrison, William L. |
1991 |
Research Report |
Optimal Pricing Policies for Temporary Storage at Ports |
de Castilho, Bernardo; Daganzo, Carlos F. |
1991 |
Journal Article |
Evaluation Of Potential Hybrid Electric Vehicle Applications: Vol. II |
Gris, Arturo |
1991 |
Research Report |
Evaluation Of Potential Hybrid Electric Vehicle Applications: Vol I |
Gris, Arturo E. |
1991 |
Research Report |
Some Properties of Polling Systems |
Daganzo, Carlos F. |
1990 |
Journal Article |
Second Annual Symposium On Advanced Traffic Management Systems (ATMS) And Advanced Traveler Information Systems (ATIS), November 5, 1990 |
Haldors, Bruce; Bozzini, Anna; May, Adolf D. |
1990 |
Research Report |
Longitudinal Model Development For Automated Roadway Vehicles |
Mcmahon, Donn H.; Hedrick, J. K. |
1990 |
Research Report |
Implementing Vehicle Routing Models |
Robusté, Francesc; Daganzo, Carlos F.; Souleyrette, Reginald R. |
1990 |
Journal Article |