Implementing Vehicle Routing Models |
Robusté, Francesc; Daganzo, Carlos F.; Souleyrette, Reginald R. |
1990 |
Journal Article |
Lateral Control Of Front-wheel-steering Rubber-tire Vehicles |
Peng, Huei; Tomizuka, Masayoshi |
1990 |
Research Report |
Lean Machines: Preliminary Investigations |
Garrison, William Louis; Pitstick, Mark E. |
1990 |
Research Report |
Traffic Modeling To Evaluate Potential Benefits Of Advanced Traffic Management And In-vehicle Information Systems In A Freeway/Arterial Corridor |
Gardes, Yonnel |
1990 |
Research Report |
A Branch and Bound Solution Method for the Crane Scheduling Problem |
Peterkofsky, Roy I.; Daganzo, Carlos F. |
1990 |
Journal Article |
Large Scale Nested Logit Models: Theory and Experience |
Daganzo, C.; Kusnic, M. |
1990 |
Research Report |
Vehicle Navigation And Route Guidance Technologies: Push And Pull Factors Assessment |
Ygnace, Jean-luc; Lavallee, Paul; Al-Deek, Haitham M. |
1990 |
Research Report |
Two Proposals To Improve Freeway Traffic Flow |
Karaaslan, Ufuk; Varaiya, Pravin; Walrand, Jean |
1990 |
Research Report |
Longitudinal Control Of A Platoon Of Vehicles. III, Nonlinear Model |
Sheikholeslam, Shahab; Desoer, Charles A. |
1990 |
Research Report |
On the Coordination of Inbound and Ooutbound Schedules at Transportation Terminals |
Daganzo, Carlos F. |
1990 |
Conference Paper |
A Proposed Analytical Technique for the Design and Analysis of Major Freeway Weaving Sections |
Cassidy, Michael James |
1990 |
Dissertation |
Longitudinal Control Of A Platoon Of Vehicles. II, First And Second Order Time Derivatives Of Distance Deviations |
Sheikholeslam, Shahab; Desoer, Charles A. |
1989 |
Research Report |
Some Bounds for the Vehicle Routing Problem |
Daganzo, Carlos F. |
1989 |
Research Report |
Opportunities And Constraints For Advanced Highway Technologies: A Speculative Analysis |
Deakin, Elizabeth |
1989 |
Research Report |
Longitudinal Control Of A Platoon Of Vehicles. I, Linear Model (ucb/erl M89/106) |
Sheikholeslam, Shahab; Desoer, Charles A. |
1989 |
Research Report |
Development Of A Dynamic Equilibrium Assignment Procedure For Network-level Analysis Of New Technology |
Sullivan, Edward C.; Wong, Sun |
1989 |
Research Report |
Approximate Expressions for Queueing Systems with Scheduled Arrivals and Established Service Order |
Sabria, Federico; Daganzo, Carlos F. |
1989 |
Journal Article |
Some Theoretical Aspects Of The Benefits Of En-route Vehicle Guidance (ervg) |
Al-Deek, Haitham M.; Kanafani, Adib K. |
1989 |
Research Report |
The Crane Scheduling Problem |
Daganzo, Carlos F. |
1989 |
Journal Article |
Potential Benefits Of In-vehicle Information Systems (ivis): Demand And Incident Sensitivity Analysis |
Al-Deek, Haitham M. F. |
1989 |
Research Report |
Theory of Highway Traffic Signals |
Newell, Gordon F. |
1989 |
Research Report |
Crane Productivity and Ship Delay in Ports |
Daganzo, Carlos F. |
1989 |
Journal Article |
Lateral Guidance System Requirements Definition |
Parsons, Robert E.; Zhang, Wei-Bin |
1988 |
Research Report |
Potential Benefits Of In-vehicle Information Systems In A Real Life Freeway Corridor Under Recurring And Incident-induced Congestion |
Al-deek, Haitham |
1988 |
Research Report |
A Comparison of In-Vehicle and Out-of- Vehicle Freight Consolidation Strategies |
Daganzo, Carlos F. |
1988 |
Journal Article |
Using Technology to Improve Transportation Services |
Garrison, William L. |
1988 |
Research Report |
Shipment Composition Enhancement at a Consolidation Center |
Daganzo, Carlos F. |
1988 |
Journal Article |
CALSIG Software User's Manual |
Sanchez, I.; Cassidy, M. J.; May, A. D. |
1988 |
Journal Article |
The 1985 Highway Capacity Manual: Supplemental Report for California Conditions |
Cassidy, M. J.; May, A. D. |
1988 |
Journal Article |
Research Problem for the 1985 Highway Capacity Manual |
Cassidy, M. J.; May, A. D. |
1988 |
Journal Article |
CALSIG an Analysis and Design Procedure for Signalized Intersections |
Cassidy, M. J.; May, A. D. |
1988 |
Journal Article |
Optimum Bunker Size and Location in Underground Coal Mine Conveyor Systems |
Baral, Suresh C.; Daganzo, Carlos F.; Hood, Michael |
1987 |
Journal Article |
A Research Plan for Highway Vehicle Navigation Technology |
Gosling, Geoffrey D. |
1987 |
Research Report |
Highway Electrification: An Exploration of Energy Supply Implications |
Wang, Quanlu; Sperling, Daniel |
1987 |
Research Report |
Effect of Longitudinal Control on Capacity |
Beji, Yousser |
1987 |
Research Report |
Freight Transportation and Highway Automation: Research on Advanced Technologies for Goods Movement as an Integral Part of the PATH Program |
Stevens, Ann D. |
1987 |
Research Report |
Towards a Technology Assessment of Highway Navigation and Route Guidance |
Kanafani, Adib |
1987 |
Research Report |
Transportation Opportunities and Constraints: The Performance of Urban Highway Transportation |
Garrison, William L. |
1987 |
Research Report |
The Break-Bulk Role of Terminals in Many-to-Many Logistic Networks |
Daganzo, Carlos F. |
1987 |
Journal Article |
Modeling Distribution Problems with Time Windows. Part II: Two Customer Types |
Daganzo, Carlos F. |
1987 |
Journal Article |
Modeling Distribution Problems with Time Windows: Part I |
Daganzo, Carlos F. |
1987 |
Journal Article |
Increasing Model Precision Can Reduce Accuracy |
Daganzo, Carlos F. |
1987 |
Journal Article |
Dynamic Blocking for Railyards: Part II. Heterogeneous Traffic |
Daganzo, Carlos F. |
1987 |
Journal Article |
Dynamic Blocking for Railyards: Part I. Homogeneous Traffic |
Daganzo, Carlos F. |
1987 |
Journal Article |
Reducing Logistics Costs at General Motors |
Blumenfeld, Dennis E.; Burns, Lawrence D.; Daganzo, Carlos F.; Frick, Michael C.; Hall, Randolf W. |
1987 |
Journal Article |
Mission and Mix: A Study of the Changing Tasks and Staffing Requirements the California Department of Transportation |
Jones, David W.; Taylor, Brian D. |
1987 |
Research Report |
Assembly Line Job Sequencing Principles |
Burns, Lawrence D.; Daganzo, Carlos F. |
1987 |
Journal Article |
Design of Multiple Vehicle Delivery Tours—II Other Metrics |
Newell, Gordon F.; Daganzo, Carlos F. |
1986 |
Journal Article |
A Graphical Method for Optimizing a Continuous Review Inventory System |
Horowitz, Abraham D; Daganzo, Carlos F. |
1986 |
Book |
Design of Multiple-Vehicle Delivery Tours—I A Ring-Radial Network |
Newell, Gordon F.; Daganzo, Carlos F. |
1986 |
Journal Article |