Publications

Title Author Year Publication type
A Routing Model for Pickups and Deliveries: No Capacity Restrictions on the Secondary Items Daganzo, Carlos F.; Hall, Randolph W. 1993 Journal Article
Highway Electrification And Automation Technologies - Regional Impacts Analysis Project: Phase III Appendices: Mobility Statistics Scag; Path 1993 Research Report
Highway Electrification And Automation Technologies - Regional Impacts Analysis Project: Phase II: Scenario For Advanced Highway Technologies Scag; Partners for Advanced Transportation Technology (PATH) 1993 Research Report
Highway Electrification And Automation Technologies - Regional Impacts Analysis Project: Executive Summary Scag; Path 1993 Research Report
Highway Electrification And Automation Technologies - Regional Impacts Analysis Project: Phase III: Impacts Analysis Results Scag; Path 1993 Research Report
Communication Requirements and Network Design for IVHS Hsu, Ivy Pei-Shan; Walrand, Jean 1993 Research Report
A Simulation-Based Framework For The Analysis Of Traffic Networks Operating With Real-time Information Jayakrishnan, R.; Cohen, Michael; Kim, John; Mahmassani, Hani S.; Hu, Ta-yin 1993 Research Report
Models Of Commuters' Information Use And Route Choice: Initial Results Based On A Southern California Commuter Route Choice Survey Abdel-aty, Mohamed A.; Vaughn, Kenneth M.; Kitamura, Ryuichi; Jovanis, Paul P.; Mannering, Fred L. 1993 Research Report
Longitudinal And Lateral Throughput On An Idealized Highway Hall, Randolph W. 1993 Research Report
A Continuing Systems-level Evaluation Of Automated Urban Freeways: Year Three Johnston, Robert A.; Ceerla, Raju 1993 Research Report
Moving Queues in Freeway Traffic Networks Daganzo, Carlos F.; Lin, W. H. 1993 Conference Paper
Summary of Observations on July 1993 Study Tour to Japan Orne, Donald E.; Shladover, Steven E. 1993 Research Report
Spectrum Needs For IVHS Linnartz, Jean-paul M. G.; Walrand, Jean 1993 Research Report
Experimental Analysis And Modeling Of Sequential Route Choice Under ATIS In A Simple Traffic Network Vaughn, Kenneth M.; Abdel-aty, Mohamed A.; Kitamura, Ryichi; Jovanis, Paul P.; Yang, Hai 1993 Research Report
Impact Of ATIS On Drivers' Decisions And Route Choice: A Literature Review Abel-aty, Mohamed A.; Vaughn, Kenneth M.; Kitamura, Ryuichi; Jovanis, Paul P. 1993 Research Report
Exploration Of Driver Route Choice With Advanced Traveler Information Using Neural Network Concepts Yang, Hai; Kitamura, Ryuichi; Jovanis, Paul P.; Vaughn, Kenneth M.; Abdel-aty, Mohammed A.; Reddy, Prasuna Dvg 1993 Research Report
Behavioral Impacts Of Recurring And Incident Congestion And Response To Advanced Traveler Information Systems In The Bay Area: An Overview Khattak, Asad J. 1993 Research Report
Analysis Of Arterial Street Data From The ATSAC System Bacon, Jr., Vinton W.; May, Adolf D. 1993 Research Report
Users’ Guide and Design Description SmartPath Simulator - Version MOU62 Hongola, Bruce; Tsao, Jacob; Hall, Randolph 1993 Research Report
Freeway Detector Data Analysis For Simulation Of The Santa Monica Freeway - Initial Investigations Bloomberg, Loren D.; Bacon, Vinton W., Jr.; May, Adolf D. 1993 Research Report
Rapid Prototyping Of Advanced Driver Interface Systems Massa, Laura J.; Mendel, Max B. 1993 Research Report
Advanced Public Transportation Systems: A Taxonomy And Commercial Availability Khattak, Asad; Noeimi, Hisham; Al-deek, Haitham; Hall, Randolph 1993 Research Report
Evaluation Of The Transit Information System In Southern California Le Colletter, Emmanuel; Yim, Youngbin; Hall, Randolph 1993 Research Report
Collecting Road Traffic Data Using ALOHA Mobile Radio Channel Linnartz, Jean-Paul M.G.; Gamba, David P. 1993 Research Report
Freeway Detector Data Analysis For Simulation Of The Santa Monica Freeway - Summary Report Bloomberg, Loren D.; May, Adolf D. 1993 Research Report
Simulation of IVHS on the Santa Monica Freeway Corridor Using the INTEGRATION Model. Phase 2: Preliminary ATIS and ATMS Experiments Gardes, Yonnel; May, Adolf D. 1993 Research Report
The Spatial Evolution of Traffic Under the Two Wave Speed Assumption: A Shortcut Procedure and Some Observations Daganzo, Carlos F. 1993 Research Report
The Spatial Evolution of Traffic Under the Two Wave Speed Assumption: A Shortcut Procedure and Some Observations Daganzo, Carlos F. 1993 Research Report
The Cell Transmission Model. Part I: A Simple Dynamic Representation Of Highway Traffic Daganzo, Carlos 1993 Research Report
Robust Computation of Optical Flow in a Multi-Scale Differential Framework Weber, Joseph; Malik, Jitendra 1993 Research Report
A Systematic Evaluation Of The Impacts Of Real-traffic Condition Information On Traffic Flow Adler, Jeffrey L.; Recker, Wilfred W.; Mcnally, Michael G. 1993 Research Report
A Probabilistic Model And A Software Tool For AVCS Longitudinal Collision/safety Analysis Tsao, H. S. Jacob; Hall, Randolph W. 1993 Research Report
Handling Operations and the Lot Size Trade-off Daganzo, Carlos F.; Newell, Gordon F. 1993 Journal Article
Vehicle To Roadside Communications Study Polydoros, Andreas; Dessouky, Khaled; Pereira, Jorge M. N.; Sun, Chung-ming; Lee, Kuo-chun; Papavassiliou, Thomas D.; Li, Victor O. K. 1993 Research Report
Neural Network Models For Automated Detection Of Non-recurring Congestion Ritchie, Stephen G.; Cheu, Ruey L. 1993 Research Report
Evaluating the Capacity of Freeway Weaving Sections Wang, Mu-han; Cassidy, Michael J.; Chan, Patrick; May, Adolf D. 1993 Journal Article
Simulation Of IVHS On The Smart Corridor Using The Integration Model: Phase 1: Initial Investigations Gardes, Yonnel; May, Adolf D. 1993 Research Report
Small Cars In Neighborhoods Bosselmann, Peter C.; Cullinane, Daniel; Garrison, William L.; Maxey, Carl M. 1993 Research Report
Handling Strategies for Import Containers at Marine Terminals de Castillo, Bernardo; Daganzo, Carlos F. 1993 Journal Article
Message Volumes For Two Examples Of Automated Freeway Hitchcock, Anthony 1993 Research Report
Storage Space vs Handling Work in Container Terminals Taleb-Ibrahimi, Mounira; de Castilho, Bernardo; Daganzo, Carlos F. 1993 Journal Article
Observations On European Advanced Traveler Information And Traffic Management Systems Yim, Youngbin; Ygnace, Jean-luc 1993 Research Report
Feasibility Study Of Advanced Technology Hov Systems: Volume 3: Benefit Implications Of Alternative Policies For Including Hov Lanes In Route Guidance Networks Chira-Chavala, T.; Lin, W. H. 1992 Research Report
Transitional Platoon Maneuvers In An Automated Highway System Hedrick, J. K.; Narendran, V. K.; Chang, K. S. 1992 Research Report
Feasibility Study Of Advanced Technology Hov Systems: Volume 4: Implementation Of Lateral Control Systems In Transitways Chira-chavala, Ted; Zhang, W. B.; Walker, J.; Javandel, F.; Demsetz, L. 1992 Research Report
A Planning Methodology For Intelligent Urban Transportation Systems Kanafani, Adib; Khattak, Asad; Crotty, Melanie; Dahlgren, Joy 1992 Research Report
Methods Of Analysis Of IVHS Safety: Executive Summary Hitchcock, Anthony 1992 Research Report
A Specification Of An Automated Freeway With Vehicle-Borne Intelligence Hitchcock, Anthony 1992 Research Report
The Role Of Advanced Traveller Information Systems In Incident Management Al-deek, Haitham Mohammed 1992 Research Report
Feasibility Study Of Advanced Technology Hov Systems: Volume 2b: Emissions Impact Of Roadway-powered Electric Buses, Light-duty Vehicles, And Automobiles Miller, Mark A.; Dato, Victor; Chira-chavala, Ted 1992 Research Report